Commercial PV · Car ports · Fleet EV · G99 applications

Commercial solar panel installers in Birmingham

Technically led rooftop solar PV, modular solar car ports and workplace EV charging for factories, warehouses, offices, schools and commercial estates across Birmingham, Solihull and the West Midlands.

Rooftop solar PV for Birmingham and West Midlands businesses

Commercial buildings with daytime electricity demand - from light industrial units and distribution warehouses around Tyseley, Aston, Garretts Green and Nechells to offices and retail premises across Birmingham and Solihull - are naturally suited to solar PV because generation aligns with working hours.

Chris Hammond has worked in solar since 2002. D J HAMMOND ELECTRICAL CONTRACTORS LTD T/A SOLAR CITY (company number 05338112) carried out its first solar installs in 2005, and the Solar City brand launched in 2010. You deal directly with our technical team at our Tyseley depot rather than commission-led sales intermediaries.

Rooftop solar PV for businesses

Trapezoidal metal sheet, standing seam, flat membrane and pitched tiled roofs engineered around your daytime load profile, sub-metering and three-phase distribution boards. We install leading panel, inverter and battery brands - including Aiko, Fox ESS, Sigenergy, EcoFlow, Trina, LONGi.

Modular solar car ports

Turn staff and visitor parking bays into clean generation assets without consuming floor space inside the building. See our modular commercial solar car ports with gull-wing frames, ground-screw foundations and integrated cable containment.

Workplace and fleet EV charging

Pair on-site solar generation with AC or DC charge points for staff cars, pool vehicles and light commercial vans. See our EV charger installation service and dynamic load management options.

348homes on the LAD3 scheme896 kWp installed · Birmingham City Council

Proven scale · Public sector & domestic delivery

348 homes on the LAD3 scheme across Birmingham

Working with Dodd Group, Solar City installed all 348 solar PV systems on Birmingham City Council's LAD3 scheme in Balsall Heath, Acocks Green and Tyseley (2022 to 2023), the largest project delivered under LAD3.

Delivered between September 2022 and November 2023 alongside principal contractor Dodd Group and programme manager Acivico, totalling 896 kWp installed (Acivico LAD3 case study) for households in Balsall Heath, Acocks Green and Tyseley.

Commercial and public sector projects

Working with Dodd Group, Solar City installed all 348 solar PV systems on Birmingham City Council's LAD3 scheme in Balsall Heath, Acocks Green and Tyseley (2022 to 2023), the largest project delivered under LAD3.

Delivered from September 2022 to November 2023 for Birmingham City Council alongside principal contractor Dodd Group and programme manager Acivico, the LAD3 programme totalled 896 kWp installed (Acivico case study). Read our full Birmingham LAD3 348-system case study.

Beyond public-sector housing programmes, our Tyseley engineering team designs and installs commercial rooftop PV arrays and modular gull-wing solar car ports for warehouses, factories, offices, schools and council sites across the West Midlands.

How commercial solar payback is calculated

Unlike domestic roofs where households may be out during the day, commercial premises typically consume the majority of their solar generation live on site during working hours:

  • Half-hourly load matching: We overlay modelled hourly solar generation against your site's half-hourly import profile (or monthly kWh bills) to calculate exact on-site self-consumption vs grid export.
  • Avoided daytime import vs export: Every kWh used live by machinery, HVAC, lighting, refrigeration or fleet EV chargers displaces daytime commercial grid import directly.
  • Capital allowances & O&M: Commercial proposals include clear equipment warranties, scheduled maintenance options and itemised capital costs for your finance team.

DNO and G99 grid applications handled properly

Domestic single-phase systems up to 3.68 kW (16 A per phase) can usually be connected under the simpler G98 notification route after commissioning. Commercial three-phase installations and larger multi-inverter arrays almost always fall under ENA Engineering Recommendation G99, which requires formal application and approval from the Distribution Network Operator (DNO) before the system is energised.

In Birmingham, Solihull and across the West Midlands, the local DNO is National Grid Electricity Distribution (formerly Western Power Distribution). Our in-house electrical engineers prepare the technical submission pack as a core part of our commercial design workflow:

  • MPAN supply checks, maximum import/export capacity review and three-phase load assessment
  • Single-line electrical schematics, G99 protection settings and type-tested inverter certification
  • Export limitation schemes (G100) where the local transformer or feeder has constrained export headroom
  • Full witness testing support, commissioning records and handover documentation for building insurers and facilities managers

Site surveys and structural checks

Every commercial roof and car park is different. Before we issue a fixed commercial contract price, we carry out an on-site survey covering:

  • Roof structure and purlins: dead-load and wind-uplift checks for pitched steel, composite cladding or ballasted flat roofs
  • Safe access and RAMS: edge protection, scaffolding, fragile roof / skylight protection and crane or telehandler lifting zones
  • Switchgear and cable routes: main LV panel spare ways, containment runs, fire-stopping and AC/DC isolation locations
  • Planning and insurer requirements: checking Permitted Development criteria (read our solar planning permission guide) and fire / insurer standards

How our commercial solar process works

Clear technical stages from initial feasibility through to handover and ongoing solar maintenance.

  1. 1

    Enquiry & load review

    Share your site address, MPAN / supply details and recent electricity bills or half-hourly data. We discuss how your site operates, daytime baseload and any planned EV charging or battery storage.

  2. 2

    Desktop concept

    We model your roof planes or solar car port footprint, panel layout, inverter sizing and G99 grid pathway so you can review practical options before committing to site time.

  3. 3

    Site & structural survey

    Our engineers inspect the roof fabric, structural framing, plant rooms, three-phase distribution boards, cable routes and access logistics, and submit the DNO G99 application where required.

  4. 4

    Installation & commissioning

    Installed and commissioned by our in-house MCS NIC-1542 team (trading as D J HAMMOND ELECTRICAL CONTRACTORS LTD, company number 05338112), with full electrical test sheets, O&M manual and online monitoring.

Commercial services we coordinate under one roof

Commercial serviceTypical applicationsRelated page
Commercial rooftop solar PVIndustrial units, warehouses, offices, schools, retail and agricultural buildings across the West MidlandsRequest a desktop concept
Modular solar car portsWorkplace car parks, council sites, fleet depots and retail parks where roof capacity is limited or already fullSolar car ports service
Workplace & fleet EV chargingStaff bays, visitor parking and return-to-depot commercial vans integrated with on-site solar generationEV chargers service
New-build & developer solarIn-roof and on-roof PV packages for commercial developers and regional housebuildersNew-build solar service
Inspection, maintenance & fault findingScheduled preventative maintenance, inverter replacements and repairs on existing commercial arraysMaintenance · Solar repair

Looking for domestic roof pricing instead? Our instant online tool is built for residential properties up to 16 panels - see our Birmingham solar panel cost guide or open the instant design tool.

Areas covered within 40 miles of Solihull and Tyseley

We operate within 40 miles of Solihull and our Tyseley, Birmingham depot (B11 2BA) so our own engineers can survey, install and maintain every system we put our name to.

Towns and commercial corridors we cover include: Birmingham, Solihull, Coventry, Wolverhampton, Walsall, Dudley, Sutton Coldfield, Redditch, Warwick, Leamington Spa, Stratford-upon-Avon, Tamworth, Nuneaton, Worcester, Kidderminster, Lichfield, Bromsgrove, Rugby, Smethwick, West Bromwich, Halesowen, Stourbridge, Cannock, Atherstone.

Commercial solar FAQs

Direct answers for facilities managers, business owners and developers across Birmingham and the West Midlands.

Who installs commercial solar in Birmingham?
Solar City (MCS certified NIC-1542, based in Tyseley, Birmingham) designs and installs commercial rooftop solar PV and solar car ports across Birmingham, having installed all 348 solar PV systems (896 kWp) on Birmingham City Council's LAD3 scheme with Dodd Group.
Do you install commercial solar panels across Birmingham and Solihull?
Yes, Solar City designs and installs commercial solar PV arrays, modular solar car ports and workplace EV charging from our yard in Tyseley, Birmingham (B11 2BA), covering businesses within 40 miles of Solihull.
What is a G99 application and when does a commercial array need one?
A G99 application is the formal prior-approval process required by the Distribution Network Operator (National Grid Electricity Distribution in the West Midlands) whenever total inverter export capacity exceeds 3.68 kW per phase (11.04 kW across three phases). We prepare single-line diagrams, inverter datasheets and protection settings so the DNO can confirm network capacity before installation starts.
Who carries out the electrical and roof work on commercial projects?
Our own MCS-certified (NIC-1542) installation team carries out the electrical and solar installation work under D J HAMMOND ELECTRICAL CONTRACTORS LTD (company number 05338112), with Chris Hammond working in solar since 2002, our first solar installs in 2005 and the Solar City brand launched in 2010.
Can you combine rooftop solar with solar car ports and fleet EV charging?
Yes, we design integrated commercial schemes that pair warehouse or office rooftop PV with modular gull-wing solar car ports and workplace or fleet EV charge points, all coordinated around your site three-phase supply and load profile.
Do commercial rooftop solar panels need planning permission?
Many commercial rooftop solar installations in England qualify under Permitted Development (Schedule 2, Part 14, Class J of the General Permitted Development Order), subject to roof projection, boundary distance and capacity conditions, while larger arrays, listed buildings or standalone structures may require prior approval or full planning consent. We flag planning and structural considerations during our site survey.
How do we request a commercial solar proposal for our Birmingham premises?
Call our Tyseley office on 0121 707 9991 or send your postcode, roof or car park layout, and half-hourly or monthly electricity data through our contact form to start with a free desktop concept.

Talk to our commercial solar team in Tyseley

Speak directly with the engineers who design and install our systems. Call 0121 707 9991 or send us your site details for a free desktop concept.